Ikea Sheffield

Ikea Sheffield

Complete air handling solution for the new IKEA store in Sheffield.

Mansfield Pollard are our supplier of choice because they always deliver solutions on time & on budget.

Tom O’Donoghue -Project Manager, NORSTEAD

  • Challenges
  • Our Solutions
  • Highlights

To provide a complete air handling solution for the new IKEA store in Sheffield. The 8 units were designed to serve all areas including the market hall and self serve warehouse, ranging in size from 1.5m³/s through to 13m³/s.

IKEA standards dictated that all units had to include integrated coil valves and pipework and also undergo FAT testing prior to installation on site.

All units had to be manufactured simultaneously and delivered within a deadline of 4-5 weeks from drawing approval to comply with the store build timetable..

Mansfield Pollards flexible manufacturing locations enabled concurrent build in all three factory sites. Project dedicated staff and implementation of 24 hour rotating shifts meant our agile workforce were able to deliver the units on time.

Utilising our innovative sectionalised construction methods the units (up to 7.5m wide and 7m long) were easily transported and quickly built up on-site. Integrated heat meters and coils combined with factory FAT testing ensured ‘plug & play’ functionality of the units on-site.

Integrated coils, valves.

And pipework.Fully f.A.T. Tested prior.

To installation.Agile & dedicated staff.

Ensured on-time delivery.Bespoke units up to 13m3/s.