Selfridges Birmingham

selfridges birmingham at night

Eleven high capacity AHUs manufactured and installed simultaneously.

Mansfield Pollard’s modular units were the perfect solution to our efficient on-site build program.

  • Challenges
  • Our Solution
  • Highlights

To provide eleven air handling units manufactured, delivered and installed simultaneously. Eight units were needed to service the sales areas and required stringent temperature and humidity control.

Three units were required to service other areas of the installation including staff rooms and store areas. Each supply and extract unit was designed to handle in excess of 16m3/s and were to be installed and commissioned within a very demanding timescale.

Our flexible workforce and premises allowed all the units to be built simultaneously.

Mansfield Pollard’s unique modular build construction was employed to allow individual sections to be easily transported and assembled on site.

Prior to transportation, each unit was fully tested in our dedicated facility to eradicate any potential on-site issues. All on-site installation was undertaken by Mansfield Pollard’s experienced site team ensuring a smooth and efficient handover.

16m3/s supply & extract.

Simultaneous delivery & installation.

One company from Design to commissioning.

100% on-time & on budget.