The Project
Located on the rooftop of a school in Leeds, the AHU was originally designed and manufactured back in 2004. The AHU refurbishment was scheduled to be completed during a much-needed roof repair over a strict 4 day period. It was essential our team of technical engineers moved the AHU from its original position, carried out the refurbishment, and then moved it again into a new position once the roof repair was completed.
The Solutions
Our expert team stripped the full AHU/Ductwork and all the electrical wiring to allow the roof repairs to take place. This was followed by a full internal component renovation: including a fan upgrade, coil replacement, and a new energy control system which delivers huge energy and cost savings whilst significantly contributing to their sustainability targets.
The Highlights
Strict time period for refurbishment: Working with multiple companies ensure work is completed at a convenient time.
Increased Energy Efficiency: Improving energy efficiency and reliability through effective internal component renovation.
Increase Life Cycle & Future Proofing: Component upgrades and cleaning to ensure the longevity of the AHU..
Reduced Maintenance: Lower on-going maintenance costs whilst ensuring legal compliance